|
Nam-Con-Son Pipeline
|
There is a requirement for following position for Nam-Con-Son Pipeline project :
1. Pipeline Engineer Offshore
2. Pipeline Installation Engineer Offshore
3. Lead Engineer for Onshore Pipeline
4. Senior Engineer for Onshore Pipeline
5. Mechanical Engineer for WHP topside
6. E&I Engineer for WHP Topside
7. Civil/structural Engineer for Gas process plant
8. Project Manager for nam con son 2 gas process plant + offshore pipeline
9. Project Engineer for gas process plant + offshore pipeline
10. Lead Piping Engineer
11. Lead HSE Engineer
Location : Ho Chi Minh, Vietnam.
Experience: More than 5 Years.
If interested please email your cv with relevant certificate tonassermanpower@gmail.com or nasser@jasmarine.com.my and if the requirement is not suite with your expertise please forward to your friends.
Project Background info
Existing Nam-Con-Son Pipeline System Description
Nam-Con-Son (NCS) pipeline is now transporting gas from Lan Tay field (block 06.1 of Nam Con Son basin) via pipe routing Lan Tay-Long Hai-Dinh Co. Offshore gas from this pipeline is treated by Dinh Co Gas Processing Plant (GPP). Dry gas is transported via Dinh Co – Phu My pipeline to Phu My Gas Distribution Center (GDC), which distributes to Power Plants at Phu My.
The NCS 2 pipeline system consists of the following items:
NCS-2 pipeline system is predicted to consist of the following items:
- Pipeline system transports fluid mainly from Block 05-2, Block 05-3 and Thien Ung fields. This pipeline is predicted to parallel to NCS pipeline and landfall in Long Hai, Vung Tau province.
- Onshore pipeline from landfall location to GPP at Dinh Co and from GPP to GDC at Phu My. This pipeline is also parallel to existing Long Hai-Dinh Co- Phu My pipeline.
- 270km 26” pipeline from Lan Tay field to Dinh Co GPP.
- Dinh Co GPP which produce condensate & treated gas.
- 6” condensate pipeline from Dinh Co to Thi Vai via Dinh Co – Thi Vai pipeline belonging to Bach Ho gas project.
- 32km 30” gas pipeline from Dinh Co to Phu My GDC which distributes gas to Power Plants PM-1,2,3 & 4 and 20” Future Tie-In Points for under contructed Phu My – Ho Chi Minh gas pipeline system.
- Phu My GDC has 04 compressor packages to distribute gas to above mentioned Power Plants. Total capacity of Phu My GDC is around 10.48 MMSCMD, and also has future tie-in points for other demands.
- Common gas manifold at Phu My GDC for Bach Ho and Nam Con Son project.
- Lan Tay - Dinh Co – Phu My gas pipeline with capacity of 7.0 BSCMY. This pipeline is also connected to gas pipeline from fields Rong Doi / Rong Doi Tay...etc.
Thank you.
Regards.
Mohammad Nasser Bin Ismail
Jas Marine (M) Sdn Bhd
Manager, Manpower Supply
Tel:+603.9284.3663
HP: +6016.338.4657
Email : nassermanpower@gmail.com or nasser@jasmarine.com.my
0 comments:
Post a Comment